Friday, August 23, 2019

WEEK 4 FYP2

WEEK 4

DATE: 14/8/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR
👉 COMPONENT

Activities
  • I had bought all the component needed to do the testing at Autobotic Sdn Bhd, Setapak. It is easier buying the component here as I can do online ordering and when all the component is ready, I just go to the shop picking up the component.
  • COMPONENT
    QUANTITY
    PRICE
    Arduino Uno
    1
    RM23.50
    WEMOS D1 WiFi Module
    1
    RM26.50
    Sound Sensor FC-04
    1
    RM4.60
    9V battery
    1
    RM2.50
All the component is in a good condition.

Sunday, August 18, 2019

WEEK 3 FYP2

WEEK 3

DATE: 8/8/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR
👉  Meeting With Supervisor

Activities
  • The students were introduced to one of the representative from the industry who is expert in biomedical engineering to present our FYP2 project ideas to him.
  • During the meeting, we shared ideas and information on how the project works and also discussed on how to develop the prototype.
  • It is good to be able to share the ideas and knowledge with the engineer as he has many experience in the industry and told us the improvement that can be made with our project.
  • After the meeting, I discussed with the supervisor the progress in developing the prototype. The next step is to contact the Radibems at Level 3, asking them whether I can use the medical equipment in their office. This is because I need a sample of medical equipment that is faulty with a different brand to compare the result of the sound produced. 

DATE: 9/8/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR
👉  Study previous FYP project

Activities
  • I did the study and read on the previous related project done by the senior. Their project is basically about the detection of faulty alarm from medical equipment but they are using different type of signal conditioning circuit, different types of faulty alarm and also different medical equipment. The way of sending the notification to the end user also is different. 
  • By studying previous project, I get the ideas on how to improve the product in term of its accuracy, design and also data collection.
  • My focus also is on the circuit construction, method used to capture the alarm sound and analyze the frequency signal. 

WEEK 2 FYP2

WEEK 2

DATE: 31/7/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR
👉  1st FYP2 Briefing

Activities

Speaker: Dr Imran Mohd Sofi

  • The first FYP2 briefing is about the planning and activities of FYP2 for the whole semester. 
  • Progress Report
    20%
    FYP Exhibition Day
    35%
    Final Report
    35%
    Technical Paper
    10%
                     FYP2 Assessments
  • Important dates: 


DATE: 29/7/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR
👉  SEARCH RELATED ARTICLES/ VIDEOS

Activities

  • Read articles on the types and frequency of infusion pump alarms: Protocol for a Retrospective Data Analysis. The objectives of the study is to analyze baseline data related to the types and frequency of infusion pump alarms from the B. Braun Outlook 400ES Safety Infusion System with the accompanying DoseTrac Infusion Management Software. This study will analyze the  overall infusion pump alarm frequency (number of alarms per active infusion), duration of alarms (average, range, median), and type and frequency of alarms distributed by care area.

Links



WEEK 1 FYP2

WEEK 1

DATE: 19/7/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR
👉  SURVEY COMPONENT PRICE

Activities
  • I did the survey on the price of the component needed for my FYP2 Project. 
  • I have been comparing the price of the component between Shopee, Lazada and Autobotic Sdn Bhd.
  • Autobotic Sdn Bhd
    Shopee
    Lazada
    Arduino UNO R3 Compatible
    RM 23.50
    RM 25.50
    RM 22.50
    Arduino WeMos WiFi Module
    RM 26.50
    RM 25.90
    RM 25.90
    Battery 9V
    RM 2.50
    RM 5.50
    RM 6.90
    Battery Holder
    RM 2.90
    RM 1.30
    RM 1.30
    Jumper female to female
    RM 2.80
    RM 3.00
    RM 3.70

👉  PLANNING FOR THE WHOLE SEMESTER


Week 1
Do the survey of the component price
Week 2
i)                1st FYP2 briefing
ii)              Search related articles/videos

Week 3
i)                Meeting with Supervisor
ii)               ii) Study previous FYP project that related to the topic

Week 4
Buy component
Week 5
i)                Testing component such as sound sensor/arduino uno
ii)              Meeting with supervisor

Week 6
Construct circuit and testing
Week 7
i)                Construct filtering circuit and testing
ii)              Meeting with supervisor

Week 8
Testing on medical equipment
Week 9
Construct hardware
Week 10
Preparation for exhibition day
Week 11
i)                Meeting with supervisor
ii)              Exhibition Day

Week 12
Getting ideas for improvement of prototype
Week 13
i)                Data collection using LabView
ii)              Meeting with supervisor

Week 14
Doing improvement of product
Week 15
Report writing
Week 16
Report writing
Week 17
Submission of Report