Sunday, February 24, 2019

WEEK 2

WEEK 2

👉 FIRST MEETING WITH SUPERVISOR

DATE: 11/2/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR


Activities
  • Discuss on the project that I need to do for my FYP 1.
  • Decided to do a project of alarm system that detect the error occur on medical equipment.
  • Supervisor explain in details the things that I need to do for this project.
Contents
  • Focus on one medical equipment which is Syringe Pump.
  • We discuss on the operation of the syringe pump which contain controller,driver and output.
  • The idea for this project is, when the component(resistor/capacitor/pcb board) inside the syringe pump causes faulty/error, alarm will detect the error and make sound. Then, the person in charge for the equipment will received notification via smart phone. The sound produced will be different for each component/pcb board that have error. 
Figure 1: Things that had been discussed during the first meeting

👉 SEARCHED AND READ ARTICLES 

DATE: 12/2/2019-17/2/2019

Activities
  • Read about 2019 Top 10 Health Technology Hazard
          Hazard number 7: Improper Customization of Physiologic  Monitor Alarm Settings May Result in Missed Alarm
  • Read on the manual operation of syringe pump. Study on how the machine works and identify the error that occur in the machine while it works.    

Links
                       

WEEK 1

WEEK 1

DATE: 6/2/2019-10/2/2019
SUPERVISOR: SIR SHAH RIZAILLI BIN MUKHTAR

ACTIVITIES

1. Searched for the title of my Final Year Project 1.
2. Read articles and journals to get the ideas for my Final Year Project 1.
3. Ask senior for their opinion on the title that i want to do for my Final Year Project 1.